Completed projects



Marjan Development Program - Pkg#6
(Saudi Aramco / Hyundai)


PROJET LOCATION : Tanajib

SCOPE OF WORK : Project objective is to provide the Fiber optic connectivity for the Temporary Construction Facilities (TCF) which includes the following SOW;
  • Fiber Optic Material Supply and Installation i.e. (FOC, UPS, Aruba, Patch Panels with Accessories etc.)
  • Reel and Post Installation Testing with OTDR of Fiber Optic Cable
  • Fiber Optic Cable Laying and Installation between POD to PMT Temporary Facility
  • Fiber Optic Cable Termination and End to End Testing (OTDR, Power Meter & Light Source)
  • Fiber Optic Cable Patching, Testing and Commissioning

Hawiyah Gas Plant Extension
(Saudi Aramco / Petrojet)


PROJET LOCATION : Hawiyah

SCOPE OF WORK : Copper Cable connectivity includes the following;
  • UTP CAT-6 Cable Drum Testing
  • Coaxial Cable Drum Testing
  • Installation of UTP CAT-6 and Coaxial Cable
  • Testing of UTP CAT-6 and Coaxial Cable (VSWR Testing)

Upgrade West Pier Facilities
(Saudi Aramco / NHC-KSA)


PROJET LOCATION : Rastanura

SCOPE OF WORK : Project objective is to provide the Fiber optic connectivity which includes the following SOW;
  • Fiber Optic Cable Drum Testing
  • Post Installation Testing with OTDR of Fiber Optic Cable
  • Fiber Optic Cable Termination and End to End Testing (OTDR, Power Meter & Light Source)
  • Fiber Optic Cable Patching, Testing and Commissioning

Upgrade Pier Facilities
(Saudi Aramco / Diamond Hills Est.)


PROJET LOCATION : Tanajib

SCOPE OF WORK : Project objective is to upgrade the Tanajib Marine Complex and provide the connectivity which include the following SOW of Telecommunication;
  • Material Supply and Installation i.e. Telecom Cabinet, Pull Box, Pedestals, Patch Panels with Accessories (Commscope, DINSPACE, EDC Corning), Grounding, Plugs (Blank, Split, Quadplex) etc.
  • Fiber Optic Equipment Installation with Accessories
  • Pulling and Installation of Subducts, Fiber Optic Cable and Copper Cable
  • Fiber Optic Cable Reel Testing with OTDR
  • Splicing of Copper Cables in Pedestals and RTPs' and Fiber Optic Cable Splicing in Joint Enclosures, Termination and Testing (OTDR, Power Meter & Light Source)
  • Termination of Copper Cables in Cabinets with Bldg. Protectors and Joint Enclosures

Upgrade Fire Water System
(Saudi Aramco / Diamond Hills Est.)


PROJET LOCATION : Rastanura

SCOPE OF WORK : Project objective is to provide the Fiber optic connectivity which includes the following SOW;
  • Fiber Optic Material Supply and Installation i.e. (FOC, UPS, Aruba, Patch Panels with Accessories etc.)
  • Reel and Post Installation Testing with OTDR of Fiber Optic Cable
  • Fiber Optic Cable Laying and Installation between NDT to PMT
  • Fiber Optic Cable Termination and End to End Testing (OTDR, Power Meter & Light Source)
  • Fiber Optic Cable Patching, Testing and Commissioning

Free Flow Pipeline System - Pkg#5
(Saudi Aramco / CPP)


PROJET LOCATION : MDRK, HRDH, HWYH

SCOPE OF WORK : Project objective is to install gas compression facilities and reduce the wellheads backpressure. Fiber Optic Cable connectivity is provided in different Haradh & Hawaiyah areas including (GOSP-1, GOSP-2, GOSP-3, Haradh Gas Plant, MDRK, Hawiyah Gas Plant) include;
  • Fiber Optic Cable Splicing and Termination
  • Fiber Optic Cable End to End Testing (OTDR, Power Meter & Light Source)
  • Fiber Optic Cable Patching, Testing and Commissioning

Haradh Power Reliability Enhancement Project
(Saudi Aramco / Al-Osais)


PROJET LOCATION : Haradh

SCOPE OF WORK : Connectivity of the following;
  • On-Reel Testing of Fiber Optic Cable
  • On-Reel Testing of Optical Power Ground Wire
  • Fiber Optic Cable Splicing/Termination and Testing

In-Plant & Interface Works Yanbu Distribution Hub S/S
(Saudi Aramco / TCGCE)


PROJET LOCATION : Yanbu

SCOPE OF WORK : Connectivity of the following;
  • Fiber Optic Cable Splicing and Termination
  • Fiber Optic Cable End to End Testing (OTDR, Power Meter & Light Source)
  • Fiber Optic Cable Patching, Testing and Commissioning

Dhahran PMT Office (Wing-A to Wing-D)
(Saudi Aramco / GMC)


PROJET LOCATION : Dhahran

SCOPE OF WORK : Connectivity of the following;
  • Fiber Optic Cable Splicing and Termination
  • Fiber Optic Cable End to End Testing (OTDR, Power Meter & Light Source)
  • Termination and Testing of 25Pair Copper Cable

Gas Well UTMN-1973
(Saudi Aramco / Nesma)


PROJET LOCATION : Utmaniyah

SCOPE OF WORK : Fiber optic connectivity and Electrical & Instrumentation work of the following;
  • Trench excavation with ductbank installation
  • FOC cable laying and backfilling with warning tape and marker post installation
  • Installation of RTU, Pressure Indicator Transmitor, Tubing, Lighting, PDHMS
  • Grounding Installation, Electrical and Instrument cable laying with termination
  • FOC Drum testing, splicing/termination and end to end testing, pre-commissioning and commissioning

Gas Well HYWH-2241
(Saudi Aramco / Kentz)


PROJET LOCATION : Hawaiyah

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • FOC splicing/termination
  • End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Oil Wells HRML-76
(Saudi Aramco / Al-Robaya Holding)


PROJET LOCATION : Harmaliyah

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • FOC splicing/termination
  • End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Replace Power Generation System – Safaniyah Area
(Saudi Aramco / Larsen & Toubro LLC)


PROJET LOCATION : Safaniyah Plant, Sub Station 2, Marjan

SCOPE OF WORK : Connectivity of the following;
  • Connectivity between new substation # 2 (230kv) with Safaniyah BSP substation, existing substation # 1 (115kv) and Submarine cable at Gantry 4
  • FOC connectivity between new substation # 2 (230kv)
  • FOC connectivity inside new substation # 2 (230kv) between PSA Panels and Relay Panels
  • FOC connectivity inside existing substation # 1 (115kv) between PSA Panel and Telecom Room (TER)
  • FOC patching, testing (OTDR, Power Meter & Light Source and CD/PMD) and commissioning of FOC between new substation # 2 and Safaniyah DCO

FOC connectivity of Oil
(Saudi Aramco / IICS Ltd.)


PROJET LOCATION : Manifa and Tanajib TB-10, 11, 17/22 and DS-31, 30, 35, 36

SCOPE OF WORK : Fiber optic connectivity of the following;
  • FOC Drum testing with OTDR
  • FOC Post installation testing with OTDR
  • Splicing and Termination of FOC
  • End to End testing (OTDR, Power Meter & Light Source and CD/PMD)
  • FOC patching, testing and commissioning of FOC

FOC connectivity and Data connectivity At PMT temporary Office
(Saudi Aramco / Larson & Toubro LLC)


PROJET LOCATION : Safaniyah DCO / Marjan site

SCOPE OF WORK : Fiber optic connectivity of the following;
  • Hand Excavation and cable pulling
  • FOC cable laying from DCO to PMT office
  • FOC Drum and Post installation testing with OTDR
  • FOC splicing/termination and testing (OTDR, Power Meter & Light Source and CD/PMD)
  • FOC patching, testing and commissioning of FOC

HRDH Evaluation Well HRDH-282
(Saudi Aramco / Al-Robaya Holding)


PROJET LOCATION : Haradh

SCOPE OF WORK : Fiber optic connectivity and Electrical & Instrumentation work of the following;
  • Trench excavation of total length 1.357km with ductbank installation
  • FOC cable laying and backfilling with warning tape and marker post installation
  • Installation of RTU, Pressure Indicator Transmitor, Tubing, Lighting, PDHMS
  • Grounding Installation, Electrical and Instrument cable laying with termination
  • FOC Drum testing, splicing/termination and end to end testing, pre-commissioning and commissioning

Oil Well HRDH-41
(Saudi Aramco / Al-Robaya Holding)


PROJET LOCATION : Haradh

SCOPE OF WORK : Electrical and Instrumentation work of the following;
  • Trench excavation
  • Electrical & Instrument cable laying and backfilling with warning tape installation
  • Installation of PDHMS
  • Grounding Installation, Electrical and Instrument cable termination
  • Pre-commissioning and commissioning

Gas Wells
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01433

PROJET LOCATION : Haradh

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • TER installations
  • FOC splicing/termination and End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning

Gas Wells
(Saudi Aramco / Al-Robaya Holding)


PROJECT BI # 10-01277

PROJET LOCATION : Haradh

SCOPE OF WORK :FOC connectivity of the following;
  • Trench excavation and ductbank installation
  • FOC drum testing, FOC laying and backfilling with warning tape and marker post installation
  • TER installations
  • FOC splicing/termination and End to End testing (OTDR and Power Meter & Light Source)
  • FOC patching, testing and commissioning